Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 3
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

This paper aims to enhance the productivity of a chilled beef production line by comparing two techniques; standard time calculation and simulation. The best improvement method was obtained using the work-study principle, a network diagram, and bottleneck identification. Two methods for improvement are proposed based on the ECRS, the Theory of Constraint (TOC), and line balancing concepts. A simulation model is developed to mimic the actual production line. The simulation results are verified, validated, and compared. Some workstations were combined, and the allocation of the workers was arranged. The present production line efficiency was 46.21%, which increased to 67.09% and 79.71% from the suggested methods. It showed that using the standard time calculation gives a different result from the simulation. In summary, the simulation model along with the application of TOC and ECRS, provides accurate information and improves overall productivity.
Go to article

Authors and Affiliations

Rendayu Jonda Neisyafitri
1
Pornthipa Ongkunaruk
2
Wisute Ongcunaruk
3

  1. Department of Agroindustrial Technology, Faculty of Agricultural Technology, Universitas Gadjah Mada, Yogyakarta, Indonesia
  2. Department of Industrial Engineering, Faculty of Engineering, Kasetsart University, Thailand
  3. Department of Electrical and Computer Engineering, Faculty of Engineering, King Mongkut’s University of Technology North Bangkok, Thailand
Download PDF Download RIS Download Bibtex

Abstract

In the paper presented have been the results of the analysis of effectiveness of operation of binary power plant consisting of combined two Clausius-Rankine cycles, namely the binary cycle with water as a working fluid in the upper cycle and organic substance as a working fluid in the lower cycle, as well as a single fluid component power plant operating also in line with the C-R cycle for superheated steam, with water as a working fluid. The influence of the parameters of superheated steam in the upper cycle has been assessed as well as the type of working fluid in the lower cycle. The results of calculations have been referred to the single-cycle classical steam power plant operating at the same parameters of superheated steam and the same mass flow rate of water circulating in both cycles. On the basis of accomplished analysis it has been shown that the binary power plant shows a greater power with respect to the reference power plant.
Go to article

Authors and Affiliations

Aleksander A. Stachel
Sławomir Wiśniewski
Download PDF Download RIS Download Bibtex

Abstract

The present work is devoted to the problem of utilization of the waste heat contained in the exhaust gases having the temperature of 350 °C. Conversion of the waste heat into electricity using a power plant working with organic fluid cycles is considered. Three Organic Rankine Cycle (ORC) power plant solutions are analysed and compared: a solution with the basic, single thermodynamic conversion cycle, one with internal heat recuperation and one with external heat recuperation. It results from the analysis that it is the proper choice of the working fluid evaporation temperature that fundamentally affects the maximum of the ORC plant output power. Application of the internal heat recuperation in the plant basic cycle results in the output power increase of approx. 5%. Addition of the external heat recuperation to the plant basic cycle, in the form of a secondary supercritical ORC power cycle can rise the output power by approx. 2%.

Go to article

Authors and Affiliations

Aleksandra Borsukiewicz-Gozdur

This page uses 'cookies'. Learn more