Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

A growing number of Czech construction companies now recognise the importance of supplementing traditional financial measurements with a wider range of non-financial measurements as well. A significant number of organisations are adopting different models of performance measurement to implement business improvement strategies. The main aim of our research was to elucidate the importance that Czech construction companies attach to the individual criteria used in measurement systems. Original data were collected using a questionnaire survey. The answers were quantified in terms of the frequency of occurrence and relative importance index. The results show that traditional measurement criteria such as time and cost are still the most important for construction companies measurement systems. Positive finding is that certain new areas of measurement are increasingly being incorporated into measurement practice and their importance for Czech construction companies is growing rapidly, especially in the area of measuring the productivity of workers and craftsmen together with the productivity of subcontractors. The environmental impact of construction is still one of the least important areas in the measurement systems of construction contracts in Czech construction companies.
Go to article

Authors and Affiliations

Petr Trtílek
1
ORCID: ORCID
Tomáš Hanák
1
ORCID: ORCID

  1. Brno University of Technology, Faculty of Civil Engineering, Veverí 331/95, 602 00 Brno, Czech Republic
Download PDF Download RIS Download Bibtex

Abstract

In June 2021, a tornado struck a large area in southern Moravia, causing extensive damage to property owned by individuals and legal entities. A need thus arose to speed up the process of estimating the amount of insurance indemnity. This process involved local inspections and subsequent assessment of quotations from construction companies for repairs, as the adjusters did not have the time and resources to estimate the amount of damage using the usual method, i.e. an itemised budget containing a list of works, supplies and services necessary to restore a structure to its original condition based on an on-site inspection. This article contains a retrospective analysis of the accepted quotations and evaluates differences in terms of scope and price compared to the standard procedure. Four apartment buildings were selected for assessment of the insulation and roof repairs. The results show that there are clear discrepancies between the price as determined by the itemised budget using the usual prices and the construction companies’ quotations. The analysis of the selected buildings has indicated that the quotations can by no means be accepted without first establishing the total damage and its actual scope. Major damage caused by a natural disaster will still have to be estimated on the basis of a personal inspection of the damaged property and preparation of an itemised budget created in line with the applicable pricing system.
Go to article

Authors and Affiliations

Michal Mikulík
1
ORCID: ORCID
Tomáš Hanák
1
ORCID: ORCID
Patrik Sokol
1
ORCID: ORCID
Miloslav Výskala
1
ORCID: ORCID

  1. Faculty of Civil Engineering, Brno University of Technology, 602 00 Brno, Czech Republic

This page uses 'cookies'. Learn more