Wyniki wyszukiwania

Filtruj wyniki

  • Czasopisma
  • Autorzy
  • Słowa kluczowe
  • Data
  • Typ

Wyniki wyszukiwania

Wyników: 1
Wyników na stronie: 25 50 75
Sortuj wg:

Abstrakt

This paper reports a new multi-item planning and scheduling problem in a job-shop production

system with the consideration of energy consumption. A mixed integer linear programming

is proposed to integrate planning and scheduling with the consideration of energy

aspect. In this study a new operational constraint is considered in the tactical level because

of the huge interest given to energy consumption and its strong link existing with production

system. To evaluate the performance of this model, computational experiments are

presented, and numerical results are given using the software CPLEX and then discussed.

Przejdź do artykułu

Autorzy i Afiliacje

Zineb Ibn Majdoub Hassani
Abdellah El Barkany
Ikram El Abbassi
Abdelouahhab Jabri
Abdel Moumen Darcherif

Ta strona wykorzystuje pliki 'cookies'. Więcej informacji