Search results

Filters

  • Journals
  • Keywords
  • Date

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The efficient protection (support reinforcement) of a wall and heading crossing ensures continuity of the production cycle, and that is a quick moving of the scraper conveyor to the wall. Using low or high bolting as a support reinforcement element in wall and heading crossings allows for the elimination of traditional methods of maintaining longwall-gate crossings, and therefore allows for the efficient use high performance modern wall complexes. The paper presents the long underground experience, of the Knurów–Szczygłowice mine of efficient support wall and heading crossing maintenance, which was bolted to the rock mass with the usage of two pairs of bolts, showing full technical and economical usefulness of this support reinforcement method. The article also highlights work safety and the increasingly common usage of endoscopies when specifying the range of crack areas which directly effects the proper choice in number, load-capacity and length of the used bolts. The underground studies the measurements of the reach of the zones of fracturing and roof stratification (using endoscopes and wire type stratification meters) and the laboratory tests (using the test stand) have allowed to determine the safety factor for maintenance of the longwall gangway crossing, directly resulting in the necessity to install additional reinforcement. The value of the safety factor Sbsc-ch greater than 1 is advantageous and safe, and the value less than or equal to 1 can lead to a significant deterioration of the conditions of maintenance of a wall and heading crossing which was bolted.

Go to article

Authors and Affiliations

Stanisław Duży
Piotr Głuch
Grzegorz Michalik
Adam Ratajczak
Download PDF Download RIS Download Bibtex

Abstract

The paper presents the experience of using the ŁPrP, ŁPKO, ŁPSp, ŁPSpA i ŁPSp3R types of flattened supports for longwall entries in the conditions of the JSW S.A. Knurów-Szczygłowice coal mine. The article concentrates on the support solutions applied in the conditions of the mine and the results in terms of stability and usefulness of the structures of the supports. An analysis of the load bearing capacity and technological conditions has been conducted for various flattened supports solutions, with special consideration given to the ŁPSp and ŁPrPJ support sets. Comparing these two, the ŁPSp exhibits a load bearing capacity that is 21% higher while using 31% less steel mass. The experiment results allowed to determine that the ŁPSpA and ŁPSp3R support types are an advantageous solutions in case of longwall set-up rooms.

Go to article

Authors and Affiliations

Piotr Głuch
Grzegorz Michalik
Tomasz Śledź
Piotr Kleibert
Adam Ratajczak
Jarosław Sobik

This page uses 'cookies'. Learn more