Search results

Filters

  • Journals
  • Keywords
  • Date

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The contemporary underground mining of raw minerals is more and more associated with geological and mining software packages which support the work of designers from the moment of the exploration of a deposit, determination of its size and quality, geological, hydrogeological and tectonic conditions, by planning the development and cutting of the deposit. Production planning is one of the most important activities carried out in the course of a mining project, because it allows to set specific production results of a mine in relation to a time unit, and then allows for a verification of the degree of completion of the assumed plan. At present, computer-aided design is applicable to daily or long-term output planning taking deposit, qualitative, quantitative and cost constraints into account. In the article, selected forms of ore deposits were presented. On the basis of several dozen boreholes up to 300m in length, an exemplary fragment of the ore cutting model using computer-aided design of mining works was presented. By using modern computer software - ABB MineScape with modular construction, the possibilities of improving the process of development of future exploitation areas have been determined. In particular, the arrangement of boreholes, based on which ones the cross sections were made with, present the exemplary lithostratigraphic thickness of layers, including the location of discontinuous deformations in the form of faults, and an ore bearing zone. For the block model, resources with priority for metal N o. 1 and 2 were calculated. I n the last section of the article, the cutting idea for a shallow ore deposit has been presented. The degree of effective use of the deposit has been analysed for the room and pillar mining method.

Go to article

Authors and Affiliations

Krzysztof Skrzypkowski
Waldemar Korzeniowski
Andrzej Gądek
Radosław Misiak

This page uses 'cookies'. Learn more