Search results

Filters

  • Journals
  • Keywords
  • Date

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The efficient protection (support reinforcement) of a wall and heading crossing ensures continuity of the production cycle, and that is a quick moving of the scraper conveyor to the wall. Using low or high bolting as a support reinforcement element in wall and heading crossings allows for the elimination of traditional methods of maintaining longwall-gate crossings, and therefore allows for the efficient use high performance modern wall complexes. The paper presents the long underground experience, of the Knurów–Szczygłowice mine of efficient support wall and heading crossing maintenance, which was bolted to the rock mass with the usage of two pairs of bolts, showing full technical and economical usefulness of this support reinforcement method. The article also highlights work safety and the increasingly common usage of endoscopies when specifying the range of crack areas which directly effects the proper choice in number, load-capacity and length of the used bolts. The underground studies the measurements of the reach of the zones of fracturing and roof stratification (using endoscopes and wire type stratification meters) and the laboratory tests (using the test stand) have allowed to determine the safety factor for maintenance of the longwall gangway crossing, directly resulting in the necessity to install additional reinforcement. The value of the safety factor Sbsc-ch greater than 1 is advantageous and safe, and the value less than or equal to 1 can lead to a significant deterioration of the conditions of maintenance of a wall and heading crossing which was bolted.

Go to article

Authors and Affiliations

Stanisław Duży
Piotr Głuch
Grzegorz Michalik
Adam Ratajczak

This page uses 'cookies'. Learn more