@ARTICLE{Potempa_Michał_Ecological_2017, author={Potempa, Michał and Shyrin, Artem}, number={Nr 100}, journal={Zeszyty Naukowe Instytutu Gospodarki Surowcami Mineralnymi Polskiej Akademii Nauk}, pages={169–182}, address={More info at Journal site: https://min-pan.krakow.pl/wydawnictwo/czasopisma/zeszyty-naukowe-instytutu-surowcami-mineralnymi-i-energia-pan/ https://min-pan.krakow.pl/wydawnictwo/wp-content/uploads/sites/4/2018/02/Wskazowki-ZN-ang-2018.pdf}, howpublished={online}, year={2017}, publisher={Instytut Gospodarki Surowcami Mineralnymi Polskiej Akademii Nauk}, abstract={The utilization of mining waste is an important problem in Poland and Ukraine. The article presents one of the variants of waste mining in the quarry in Płaza. An analysis of the resource base of the deposit and their location at the area of Płaza deposit is carried out. The Płaza deposit is located in the western part of the Małopolskie province, in the entire Chrzanów commune. The Płaza deposit is constructed of Middle Triassic carbonates represented by the limestone-dolomite Olkusz Formation and the limestone-marlized Gogolin Formation. The deposit series lies on the dolomites of Röt age (Lower Triassic – Olenekian). The most valuable raw material was the pure limestone from the lower part of the Olkusz Formation, now almost completely exploited. The article presents the current state of mineable reserves of the deposit and their quality (chemical and physical characteristics). Moreover the article shows potential consumers of raw material and the possibility of extending the life of the mine work. According to the results of the environmental monitoring the ground and hydrogeological conditions were evaluated, the results of which allowed a more efficient use of the existing quarry area for mining waste disposal to be proposed. The paper presents a conceptual waste transport scheme, planned distribution and compaction of wastes belonging to the first, second and third group and then a surface reclamation. In view of the absence of similar decisions analogs, the consideration of the open-pit as a one solid geomechanical system functioning under the conditions of uncertainty is suggested. In order to examine the dynamics of the waste compaction process, some measures are foreseen to constantly observe their subsidence. The proposed measures for the synchronous disposal of mining waste in the worked-out area of the open-pit and the simultaneous mining operation in the quarry will allow the life cycle of the open-pit to be prolonged for 15–20 years.}, type={Artykuły / Articles}, title={Ecological and geological assessment of possible disposal of mining waste in the Płaza quarry}, URL={http://www.journals.pan.pl/Content/109369/PDF-MASTER/potempa-shyrin.pdf}, keywords={storage, environmental monitoring, mining waste, waste utilization}, }